The CDM regulations apply to every construction project. Even construction work that you might not consider to be a project, like maintenance activities. It doesn't matter how long (or short) the duration of the work is. How big (or small) the task. If it is construction work, then CDM applies.
Does CDM apply to my construction project? This is a question we're often asked. And the answer is right here - yes, it does. The important thing to remember is that every project is a CDM project. The Construction (Design & Management) Regulations (CDM) apply to every construction project in some way or another, regardless of the length of, or type of, project.
CDM applies to every construction project. So if you're starting any type of construction work, you need check that everyone involved complies with their duties. Even construction work that you might not consider to be a project, like maintenance activities. It doesn't matter how long (or short) the duration of the work is. How big (or small) the task. If it is construction work, then CDM applies.
And the term construction project is far-reaching. The definition of construction work under CDM covers every type of construction activity you could think of. It includes preparation for a structure, including site clearance and groundworks, the construction, alteration, conversion, fitting-out, commissioning, renovation, repair, upkeep, redecoration or other maintenance, installation of services, and demolition and dismantling of a structure. You might not even consider what you are doing to be a 'project', but if you're carrying out any construction work, no matter how small, CDM applies.
CDM 2015 applies to all construction projects in Great Britain.
The CDM regulations have gone through several revisions since they were first introduced in 1994 . The current version (CDM 2015) introduced the latest set of changes. You no longer need a CDM coordinator. Instead, a principal designer must be appointed (in addition to the principal contractor), on projects with more than one contractor.
CDM 2015 applies to all construction projects, just like CDM 2007 did. That’s right, every construction project. It's been mentioned already, but I'm really emphasising this point because it's true even more so under CDM 2015. Although under CDM 2007, duties applied to every project, some projects (non-notifiable and domestic) were exempt from many of the CDM requirements. However, this is no longer the case under CDM 2015.
Under CDM 2015, even if your project is non-notifiable, you must still comply with all the CDM duties (other than the duty to notify the HSE). So, although every construction project needs to comply with CDM, not every project needs to be notified to the HSE.
Use the free CDM notification calculator to check if you need to notify the HSE about your construction project.
Regardless of whether or not your project is notifiable, you will still have duties to discharge under CDM. And you could still get a visit from the HSE to check that you are complying. CDM failures can lead to enforcement, fines and even prison .
Everyone involved in construction work has a part to play in working safely and complying with CDM. This includes making the necessary appointments, coordinating with other duty holders, and producing CDM documentation.
There are 5 duty holders under CDM 2015:
You don't have the CDM coordinator to help you any more. There used to be someone on your team whose sole purpose was to manage CDM compliance, but now this role has gone. So, it's really important that the principal designer and principal contractor know their CDM duties. They must now assist the client, as well as performing their own duties under CDM.
11.—(1) The principal designer must plan, manage and monitor the pre-construction phase and coordinate matters relating to health and safety during the pre-construction phase to ensure that, so far as is reasonably practicable, the project is carried out without risks to health or safety.
Need help complying with your duties under CDM 2015? Follow our free CDM duty holder guides .
If a project has only one contractor involved (no other contractors or subcontractors at any stage of the project) then the roles of principal designer and principal contractor don’t need to be appointed. But pre-construction information must still be developed, inductions need to be carried out, the construction phase plan still needs to be produced, and the site must be made safe. On every project.
When there is only one contractor , the sole contractor takes on additional duties such as the requirement to produce the construction phase plan and carry out site inductions etc. The duties that would usually be carried out by the principal contractor. And the client must still comply with their client duties, without the support of the principal designer. That includes providing pre-construction information.
(4) A client must provide pre-construction information as soon as is practicable to every designer and contractor appointed, or being considered for appointment, to the project.
What about domestic projects? Does CDM 2015 apply to those? Yes! Domestic clients get some exemptions , they are not expected to be familiar with the regulations. But CDM still applies to the project itself and the rest of the project team. Everyone else on the project team, contractors and designers must apply the duties of CDM 2015 in full. Some client duties will even be transferred to other members of the team, and some appointments are made automatically and without warning!
Not sure how CDM applies to domestic projects? Find out more in CDM 2015 and working for domestic clients .
So remember, just because a project is small, and does not meet the notification thresholds, doesn’t mean you can forget about CDM. It still applies, and it is important to be familiar with the requirements and your duties.
Check if your project complies with CDM, from start to finish, with the free CDM compliance checklist .
This article was written by Emma at 新IM电竞下比赛的网址 . Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.
Get CDM support on your construction projects with our free guides and support packs for all duty holders.
CDM SupportCDM applies to all types of construction projects. No matter how big or small, how short or long. CDM applies. If you work in construction, this summary of the CDM regulations will give you a good basic introduction to what you need to do, and includes 10 golden rules to follow.
Read PostThe CDM regulations have specific requirements about welfare facilities on construction sites. You must provide them - it's the law. Welfare facilities include sanitary conveniences (toilets, washing, etc.), drinking water, places for rest, and washing and changing facilities. Let's find out more about what's required.
Read PostWe often get asked if the principal contractor can be the principal designer under the CDM 2015 regulations. The principal designer should be the designer in overall control of the pre-construction phase. This is usually the architect, but in some situations, can be the principal contractor.
Read Post友情链: IM电竞app官方入口(im体育电竞app下载) im电竞最新版app | im电竞在线登录(IM电竞苹果下载) 2022im电竞官方下载 | im电竞竞猜app下载(IM电竞官网入口app最新版) 最新im电竞官网登录入口 | im电竞APP网址(IM电竞APP下载ios) 最新im电竞最新网站 | IM电竞官网下载(im电竞app官网) 最新im电竞网页登录ios下载 | im电竞app注册(im电竞下载官网) 2022im电竞安卓版 | im电竞app官方网站(可以观看im电竞的软件) 2022im电竞全站app下载 |