As you may have heard, the CDM Regulations are changing. CDM 2015 will come into force on the 6th of April 2015, and from this date every new construction project in Great Britain will be required to comply with the 2015 CDM regulations. Existing projects have until October to transition.
As you may have heard, the CDM Regulations are changing. CDM 2015 will come into force on the 6th of April 2015, and from this date every new construction project in Great Britain will be required to comply with the 2015 CDM regulations. For projects already started on site, the transitional period extends to October 2015, to comply with CDM 2015.
Many of the duties from CDM 2007 will remain, but they will now apply to domestic and non-notifiable projects. Clients on any project with more than one contractor (including subcontractors) will need to appoint all the required duty holders.
Duties will now apply to:
We know how confusing this change is going to be, as we have already had a huge demand for additional support. In answer to this, we have developed a brand support service for CDM 2015. Our service includes:
This article was written by Emma at 新IM电竞下比赛的网址 . Emma has over 10 years experience in health and safety and BSc (Hons) Construction Management. She is NEBOSH qualified and Tech IOSH.
Get CDM support on your construction projects with our free guides and support packs for all duty holders.
CDM SupportCDM applies to all types of construction projects. No matter how big or small, how short or long. CDM applies. If you work in construction, this summary of the CDM regulations will give you a good basic introduction to what you need to do, and includes 10 golden rules to follow.
Read PostThe CDM regulations have specific requirements about welfare facilities on construction sites. You must provide them - it's the law. Welfare facilities include sanitary conveniences (toilets, washing, etc.), drinking water, places for rest, and washing and changing facilities. Let's find out more about what's required.
Read PostWe often get asked if the principal contractor can be the principal designer under the CDM 2015 regulations. The principal designer should be the designer in overall control of the pre-construction phase. This is usually the architect, but in some situations, can be the principal contractor.